Fifteen years building AI systems and leading teams, at Amazon and inside Fortune 50 firms.
THE BUILD ORDER
The Five-Layer Framework for Building Teams That Outlast You.
Culture. System. Structure. People. Projects. In that order, for reasons that become obvious the moment you skip one.
If you disappeared for two weeks, could your team continue producing quality work without you?
Most teams are built for the next project. Durable ones are built to outlast their leaders.
THE FRAMEWORK
FIVE LAYERS, BUILT IN ORDER
The idea comes from the systems thinker Stewart Brand. Every complex system is several systems stacked on top of each other, each one moving at a different speed. The fast layers grab the attention: trends, markets, whatever everyone is talking about this week. The slow layers hold everything up, and they get forgotten until something cracks. A team works the same way. Five layers, ordered from slowest-changing to fastest, and each one depends on the ones below it.
- 01 CULTURE
The bedrock. The shared understanding of why the team exists, what behaviors are valued, and what the team will and won’t tolerate. Culture changes on generational timescales, and it can outlast the products, the strategies, and even the industries built on top of it.
- 02 SYSTEM
The business model, the value chain, the flywheel the company turns to create and capture value. Understanding the system is the difference between building something the business needs and building something the business politely ignores.
- 03 STRUCTURE
How work flows. Org charts, team topology, decision rights, meeting cadences, the rituals that turn strategy into execution. Structure changes on the scale of years, and it should be designed to serve the system, never the other way around.
- 04 PEOPLE
Who does the work and how they’re led. Hiring, developing, retaining, and managing the humans who execute. This layer moves in months and years, as people grow, join, leave, and evolve.
- 05 PROJECTS
The visible layer. What the team is building right now, moving in weeks and sprints. Projects are what executives ask about, and they’re the layer most likely to be mistaken for the whole job.
Each layer depends on the ones below it. Skip a layer, and the ones above it become unstable. Get the order right, and the whole structure becomes self-reinforcing: each layer creates the conditions that make the next one easier to operate.
When you skip a layer, the instability above it looks like a people problem, or an execution problem, when it’s really a foundation one.
- Skip culture, and people leave. Or worse, they stay and disengage.
- Skip the system, and the work is irrelevant.
- Skip structure, and the work doesn’t flow.
- Skip people, and nothing gets executed.
- Start at projects and work backward, and you get all of the above simultaneously.
But if the layers beneath are solid, projects almost manage themselves.
The Build Order follows one team all the way up the stack, layer by layer, through the instruments that worked and the scars from the ones that didn’t. Start at the bottom.
Ebook, paperback, and hardcover. Read the free sample first: the preface and Chapter 1.
-
We think you'd be great at leading a team.
Translation: You're productive and don't cause problems, so we're going to make you responsible for people who might.
Introduction
GENERAL -
We're re-aligning the team's priorities to better serve the business.
Translation: The team built a bunch of stuff nobody asked for, and now we have to pretend the pivot was strategic.
Ch. 1: The Build Order
GENERAL -
We have a strong culture here.
Translation: We have a unique culture here. Whether it's strong or just loud is a question nobody's allowed to ask.
Ch. 2: Culture Is Not a Poster on the Wall
01 CULTURE -
We use our values to guide every decision.
Translation: We use our values to justify every decision we were going to make anyway.
Ch. 2: Culture Is Not a Poster on the Wall
01 CULTURE -
I'm not expecting you to work weekends.
Translation: I'm working weekends and will notice if you don't, but I need plausible deniability.
Ch. 3: You Are the Culture
01 CULTURE -
We encourage teams to develop their own ways of working.
Translation: We have no consistent operating model, so you're on your own. Good luck, and please don't embarrass us at the quarterly review.
Ch. 4: Building Culture That Survives Contact with Reality
01 CULTURE -
We co-created our team values in a collaborative workshop.
Translation: The leader came in with the values already written, asked the team to rearrange the wording for ninety minutes, and called it co-creation. Everyone got a sticky note. Nobody truly got a vote.
Ch. 4: Building Culture That Survives Contact with Reality
01 CULTURE -
Our onboarding program gives new hires everything they need to succeed.
Translation: We have a two-day orientation that covers benefits enrollment, compliance training, and where to find the coffee. The actual information they need to do their job will be transmitted orally by a tired colleague sometime during week six.
Ch. 4: Building Culture That Survives Contact with Reality
01 CULTURE -
Transformation initiative.
Translation: Build impressive things, track activity metrics, hope no one notices during the budget review.
Ch. 5: Know Your Flywheel
02 SYSTEM -
We need to break down silos.
Translation: We built silos, incentivized silos, rewarded silos, and are now blaming people for acting like they're in silos.
Ch. 6: Finding Your Leverage
02 SYSTEM -
We value our middle managers as the backbone of the organization.
Translation: We expect you to absorb all the dysfunction we create and somehow produce motivated teams.
Ch. 7: Expanding Your Influence
02 SYSTEM -
We're restructuring to better align with our strategic priorities.
Translation: Someone new is in charge and they want their own org chart. The strategic priorities haven't changed. The nameplate on the corner office has.
Ch. 8: How to Build a Durable Org Chart
03 STRUCTURE -
We're an Agile organization.
Translation: We renamed our meetings and added a standup. The waterfall continues, but now it has sticky notes.
Ch. 9: The Minimum Viable Bureaucracy
03 STRUCTURE -
We have a robust governance framework to ensure alignment and manage risk.
Translation: We have six committees, four intake forms, and nobody knows who really decides. But the slides look great.
Ch. 10: Fighting the Bureaucracy Hydra
03 STRUCTURE -
We're looking for a rockstar.
Translation: We have unrealistic expectations, below-market compensation, and no onboarding plan. But the foosball table is really nice.
Ch. 11: Hiring into the Foundation
04 PEOPLE -
We invest heavily in our people's development.
Translation: We have a tuition reimbursement program nobody uses, a mandatory e-learning platform with a 12% completion rate, and a mentorship program that pairs people based on an HR spreadsheet and hopes for the best. But the budget line item looks great.
Ch. 12: The Manager's Real Job Is Conditions
04 PEOPLE -
We have a rigorous performance management process.
Translation: We have a spreadsheet, a forced ranking, and a conversation everybody dreads. The spreadsheet gets updated once a year, the ranking produces three months of passive-aggressive behavior, and the conversation ends with both parties pretending it was productive.
Ch. 12: The Manager's Real Job Is Conditions
04 PEOPLE -
We have a really collaborative culture.
Translation: Open floor plan. Nobody talks. But the Slack GIF game is world-class.
Ch. 13: The Physics of Your Team
04 PEOPLE -
This is a top priority.
Translation: This is one of our forty-seven top priorities. It will remain a top priority until the next top priority arrives, at which point it will become a 'backlog item' that nobody deletes because deleting it would require a decision.
Ch. 14: Select, Ship, Measure, and Learn
05 PROJECTS -
She really empowered her team.
Translation: The team ran itself, so leadership assumed the job was easy and gave her a harder one with fewer resources. Her reward for building a self-sustaining system was a new system that needed building from scratch.
Ch. 15: Becoming Obsolete
05 PROJECTS -
We're like a family here.
Translation: We expect unpaid emotional labor and unlimited loyalty, and like most families, we have topics nobody is allowed to bring up at dinner.
Author Original
01 CULTURE -
We have an open-door policy.
Translation: The door is open. The career consequences of walking through it are unlisted.
Author Original
01 CULTURE -
Feedback is a gift.
Translation: Feedback flowing downward is a gift. Feedback flowing upward is an attitude problem.
Author Original
01 CULTURE -
We celebrate failure here.
Translation: We celebrate one heavily edited failure story per year, told by an executive whose failure got them promoted.
Author Original
01 CULTURE -
She's a great culture fit.
Translation: We can't articulate what we're screening for, which is how we keep hiring the same person with a different haircut.
Author Original
01 CULTURE -
We work hard and play hard.
Translation: The work is mandatory. So is the play.
Author Original
01 CULTURE -
Bring your whole self to work.
Translation: Bring the parts of yourself that ship features and enjoy trivia night.
Author Original
01 CULTURE -
We're passionate about our mission.
Translation: Compensation question deflected in one sentence.
Author Original
01 CULTURE -
This is a safe space to disagree.
Translation: The disagreement will be noted, thanked, and remembered at calibration.
Author Original
01 CULTURE -
We assume positive intent.
Translation: You're required to assume ours. We'll keep our options open on yours.
Author Original
01 CULTURE -
We practice radical candor.
Translation: A book one director read that now provides air cover for whatever he was already saying.
Author Original
01 CULTURE -
We don't have egos here.
Translation: We have exactly one, and everyone schedules around it.
Author Original
01 CULTURE -
We're a flat organization.
Translation: We have a hierarchy. It's unlisted, so you learn it by stepping on it.
Author Original
01 CULTURE -
We take work-life balance seriously.
Translation: We put a meditation app in the benefits portal and a 7 a.m. standing meeting on your calendar.
Author Original
01 CULTURE -
Our people are our greatest asset.
Translation: Assets get depreciated on a schedule. So will you.
Author Original
01 CULTURE -
We encourage healthy debate.
Translation: The debate ends when the senior person repeats their original position slightly louder.
Author Original
01 CULTURE -
We have a no-blame culture.
Translation: We have a no-documentation culture. The blame still happens, just verbally and off the record.
Author Original
01 CULTURE -
We offer unlimited PTO.
Translation: PTO with an invisible ceiling you locate by triggering the ambient disappointment.
Author Original
01 CULTURE -
We promote from within.
Translation: We promoted twice from within in the last decade, and both stories are on the careers page.
Author Original
01 CULTURE -
That's not who we are.
Translation: That is exactly who we are, and this incident made it visible to people outside the building.
Author Original
01 CULTURE -
We're a data-driven organization.
Translation: We have dashboards. Decisions are still made by the loudest person in the room, who now points at a dashboard while making them.
Author Original
02 SYSTEM -
This will be our single source of truth.
Translation: The fourth single source of truth this year.
Author Original
02 SYSTEM -
We need better visibility.
Translation: I want a weekly report that I will read the morning of the meeting where you present it.
Author Original
02 SYSTEM -
Let's not boil the ocean.
Translation: Your proposal exceeds the amount of change I can personally sponsor without risk.
Author Original
02 SYSTEM -
We're aligned at the leadership level.
Translation: We had a meeting where nobody objected out loud.
Author Original
02 SYSTEM -
The numbers tell a story.
Translation: I have selected the numbers that tell my story.
Author Original
02 SYSTEM -
We measure what matters.
Translation: We measure what's easy to pull from the system we already bought, then declare that what matters.
Author Original
02 SYSTEM -
Everyone understands the strategy.
Translation: The strategy deck has been distributed. Comprehension was never verified, and questions were discouraged by the length of the meeting.
Author Original
02 SYSTEM -
It's a communication problem.
Translation: It's an incentive problem, but incentives have owners and communication doesn't.
Author Original
02 SYSTEM -
Let's take this offline.
Translation: Let's never speak of this again.
Author Original
02 SYSTEM -
We need to be more strategic.
Translation: Meaning unknown. Has scored well in performance reviews since 2009.
Author Original
02 SYSTEM -
The analysis is directionally correct.
Translation: Wrong, but from a distance and with momentum.
Author Original
02 SYSTEM -
The dashboard is the source of truth.
Translation: The dashboard is stale, three people have edit access, and one of them left in March. But it renders beautifully in the QBR.
Author Original
02 SYSTEM -
We're doubling down on analytics.
Translation: We hired one analyst and gave her four bosses.
Author Original
02 SYSTEM -
Garbage in, garbage out.
Translation: An excuse deployed exclusively after the garbage has come out, by the people who owned the intake.
Author Original
02 SYSTEM -
You'll have a dotted-line to the VP.
Translation: Two bosses, zero advocates.
Author Original
03 STRUCTURE -
We're moving to a matrix organization.
Translation: Accountability has been diluted to the point where the post-mortem can't name anyone.
Author Original
03 STRUCTURE -
We're standing up a center of excellence.
Translation: We relocated a problem so it would stop appearing in this org's metrics.
Author Original
03 STRUCTURE -
We're reviewing spans of control.
Translation: We found the number of direct reports at which a manager stops managing and starts triaging, and we are about to exceed it.
Author Original
03 STRUCTURE -
This role has a lot of cross-functional exposure.
Translation: You will be responsible for outcomes owned by people who don't report to you and don't return your Slacks.
Author Original
03 STRUCTURE -
We're creating a new team to own this.
Translation: The three teams that partially own this will now be four teams that partially own this.
Author Original
03 STRUCTURE -
You'll be the interim lead.
Translation: Permanent, unless it goes well and someone senior gets interested.
Author Original
03 STRUCTURE -
We're hiring a Head of.
Translation: Manager without the compensation. Director without the authority. Enjoy the LinkedIn bump.
Author Original
03 STRUCTURE -
We're flattening the org.
Translation: We removed a management layer and redistributed its workload to people who now do two jobs. The layer's compensation was not redistributed with it.
Author Original
03 STRUCTURE -
We're adopting a best-in-class org design.
Translation: We copied the Spotify model from a 2012 blog post that Spotify has publicly disowned.
Author Original
03 STRUCTURE -
The new structure will reduce dependencies.
Translation: The dependencies survived. They're just undocumented now, so they get resolved through friendship and guilt.
Author Original
03 STRUCTURE -
You'll report to me for now.
Translation: I collected your team in the reorg and haven't decided whether you're staying.
Author Original
03 STRUCTURE -
We need clearer swim lanes.
Translation: I want the parts of your job I like, formally transferred, in writing.
Author Original
03 STRUCTURE -
This is a stretch role.
Translation: Two jobs, one salary, and the word 'growth' deployed as anesthetic.
Author Original
03 STRUCTURE -
We're moving to a shared services model.
Translation: Nobody's problem is now everybody's ticket queue.
Author Original
03 STRUCTURE -
We only hire the best.
Translation: We hire people who interview well, which correlates with confidence, which correlates with nothing.
Author Original
04 PEOPLE -
We'll circle back on compensation.
Translation: The budget was set before the req was posted. This conversation is decorative.
Author Original
04 PEOPLE -
We're looking for someone entrepreneurial.
Translation: No budget, no headcount, no roadmap. Bring your own resources and morale.
Author Original
04 PEOPLE -
He's a strong individual contributor.
Translation: We're about to ruin him with a team.
Author Original
04 PEOPLE -
She has executive presence.
Translation: She's tall, speaks in a low register, and agrees with the VP one beat before the VP finishes.
Author Original
04 PEOPLE -
We completed our annual talent review.
Translation: We put names in a nine-box grid based on vibes, then treated the grid as data.
Author Original
04 PEOPLE -
He's a low performer.
Translation: Sometimes an underperformer. Sometimes a strong performer attached to a broken system, scored on the system's output.
Author Original
04 PEOPLE -
We're managing him out.
Translation: We're making him miserable enough to quit so we can skip the severance and the conversation.
Author Original
04 PEOPLE -
We've placed her on a performance improvement plan.
Translation: A paper trail with a start date and a predetermined ending, administered as a surprise.
Author Original
04 PEOPLE -
There's no headcount for a backfill.
Translation: The work will be redistributed to the survivors, and the org chart will quietly absorb the evidence that it was ever one person's job.
Author Original
04 PEOPLE -
We want someone who can hit the ground running.
Translation: Onboarding does not exist. Documentation does not exist. Your predecessor left no notes, and we're hoping you won't notice for ninety days.
Author Original
04 PEOPLE -
The salary is competitive.
Translation: Competitive with our other offers, which nobody accepted either.
Author Original
04 PEOPLE -
We value potential over pedigree.
Translation: For junior roles. For senior roles we require ten years at a company you've heard of.
Author Original
04 PEOPLE -
We run 360 feedback.
Translation: Anonymous until the writing style gives it away, which it always does.
Author Original
04 PEOPLE -
He's very hands-on.
Translation: He does his old job and supervises yours.
Author Original
04 PEOPLE -
She needs to work on her influencing skills.
Translation: She was right, but the people she was right at outranked her.
Author Original
04 PEOPLE -
We promote based on impact.
Translation: We promote based on visible impact, which means impact adjacent to executives, which means proximity is the skill being measured.
Author Original
04 PEOPLE -
Attrition is healthy.
Translation: The people leaving are the ones with options. We've decided to read this as a filter instead of a signal.
Author Original
04 PEOPLE -
We're invested in your growth.
Translation: There's a conference budget. It's frozen. It has been frozen since the day it was announced.
Author Original
04 PEOPLE -
New grads bring fresh energy.
Translation: New grads bring lower salaries and don't know yet what's unusual here.
Author Original
04 PEOPLE -
We're shipping an MVP.
Translation: A finished product's expectations on a prototype's budget, judged at launch against neither.
Author Original
05 PROJECTS -
We're taking an agile approach.
Translation: There is no plan.
Author Original
05 PROJECTS -
We're pursuing a fast-follower strategy.
Translation: We were surprised.
Author Original
05 PROJECTS -
We had some scope creep.
Translation: What leadership calls it when they added the scope and you missed the date.
Author Original
05 PROJECTS -
The deadline is aggressive but achievable.
Translation: The deadline was chosen at an offsite before anyone scoped the work. Achievability was assessed by asking no one.
Author Original
05 PROJECTS -
We'll iterate after launch.
Translation: Version one is the final version. The team gets reassigned Tuesday.
Author Original
05 PROJECTS -
We need a quick win.
Translation: A project whose defining feature is that a specific executive can see it from where they sit.
Author Original
05 PROJECTS -
This should be a light lift.
Translation: A phrase spoken exclusively by people who will not be doing the lifting.
Author Original
05 PROJECTS -
Let's put a pin in it.
Translation: The pin is permanent. The board it's pinned to gets thrown out at the end of the year.
Author Original
05 PROJECTS -
We're resource-constrained.
Translation: We funded eleven priorities at 60 percent each and are surprised that zero have shipped.
Author Original
05 PROJECTS -
We held a blameless post-mortem.
Translation: A meeting where we agreed the process failed so that no person had to have failed, then changed nothing about the process.
Author Original
05 PROJECTS -
We documented the lessons learned.
Translation: A document that has never once been consulted before starting the identical project.
Author Original
05 PROJECTS -
That's slated for phase two.
Translation: A fictional container for every requirement cut from phase one. Phase two does not exist. It has never existed.
Author Original
05 PROJECTS -
We're de-scoping to hit the date.
Translation: We're shipping the demo and calling it the product.
Author Original
05 PROJECTS -
We need stakeholder alignment.
Translation: Fourteen people who can say no, zero who can say yes.
Author Original
05 PROJECTS -
It's on the roadmap.
Translation: It's in a spreadsheet titled 'roadmap.' The spreadsheet is aspirational fiction reviewed twice a year.
Author Original
05 PROJECTS -
We need an executive sponsor.
Translation: The project will die without a protector, which tells you the organization attacks its own projects.
Author Original
05 PROJECTS -
We're launching a pilot program.
Translation: A production system with no budget line, no owner, and a name that lets us abandon it without admitting failure.
Author Original
05 PROJECTS -
We're pivoting.
Translation: The thing we said would work didn't, and this sentence is doing a lot of severance-avoidance for the person who said it.
Author Original
05 PROJECTS -
We're doing a soft launch.
Translation: We're launching without telling anyone, so if it breaks, it never happened.
Author Original
05 PROJECTS -
Let's schedule a working session.
Translation: The meeting will produce a follow-up meeting. The follow-up will produce a deck. The deck will produce nothing.
Author Original
GENERAL -
Got time for a quick sync?
Translation: Thirty minutes, no agenda, could have been a sentence.
Author Original
GENERAL -
I want to be respectful of everyone's time.
Translation: Announced eleven minutes into the recap of the previous meeting.
Author Original
GENERAL -
Per my last email.
Translation: I have written proof and I am this close to using it.
Author Original
GENERAL -
Happy to discuss further.
Translation: Do not discuss this further.
Author Original
GENERAL -
Great question.
Translation: A stalling noise. The answer does not exist and is being invented during this sentence.
Author Original
GENERAL -
As a leadership team, we take full responsibility.
Translation: No specific person takes any specific responsibility. Watch: nothing will change and no one will leave.
Author Original
GENERAL -
We hear you.
Translation: Acknowledgment has been performed. Please confuse it with action.
Author Original
GENERAL -
Change is hard.
Translation: Deployed exclusively by the people who designed the change, about the people absorbing it.
Author Original
GENERAL -
We're all in this together.
Translation: We are in the same weather. We are in very different boats.
Author Original
GENERAL